Find Economical Mold,Plastic Trash Can Mold,Plastic Injection Mould For Buckle on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Plastic Motorcycle Helmet Injection Mold
Home > Products > Economical Mold > Plastic Motorcycle Helmet Injection Mold

Plastic Motorcycle Helmet Injection Mold

    Payment Type: L/C, T/T, D/P, Paypal, Money Gram, Western Union
    Min. Order: 1
    Productivity: 360 Sets/Year
    Place of Origin:  Qingdao Shandong
    Supply Ability: 360 Sets/Year
    Certificate:  CE, ISO, SGS

Basic Info

Model No.:  RT-16010106

Product Description

Model NO.: RT-16010106 Surface Finish Process: Polishing Plastic Material: ABS Application: Car, Hardware Design Software: UG Certification: CE, ISO, SGS Customized: Customized Core Steel: P20 Lead Time: 35-45days Specification: CE/SGS/RoSH HS Code: 8480790090 Shaping Mode: Injection mould Mould Cavity: Single Cavity Process Combination Type: Single-Process Mode Runner: Cold Runner Installation: Fixed Standard: HASCO Surface Finish: Polishing/Painting/Coating etc. Mold Size: 500X600X600mm Trademark: Root Origin: Qingdao Shandong Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.

Professional Plastic Injection Mould Manufacturer with about 10 years experience.

Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically



Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton




Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 30-45 days
Specification
Design Software: UG/CAD
Analysis Software: Moldflow
Preferred Formats: STP/IGES/UG
Design Time: 7-15 days
Manufacture Time: 20-30 days
Delivery Time: 30-45 days
 

Contact us if you need more details on Mold. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Molding、Plastic Mold. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Economical Mold