Find Cellphone Cover Parts,Coating Service For Auto Logos,Coating Service For Auto Logos on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
High Glossy Chrome Plating Mould for Plastic Parts
Home > Products > Coating Service > High Glossy Chrome Plating Mould for Plastic Parts

High Glossy Chrome Plating Mould for Plastic Parts

    Min. Order: 1
    Place of Origin:  Qingdao Shandong
    Supply Ability: 50, 000PCS/Month

Product Description

Application: Electronic, Car Thickness: 0.4-0.5mm Injection Machine Size: 780-1200 Tons Surface Finish Process: Electroplating Plastic Material: Milon 73m40(PA6) Runner: Cold Runner Specification: CE/RoSH HS Code: 8480410010 Coating: Matte Chrome Plating Lead Time: 20-30 Days Shaping Mode: Injection mould Mould Cavity: Multi Cavity Process Combination Type: Single-Process Mode Trademark: Root Origin: Qingdao Shandong Professional Plastic Injection Mould Manufacturer with about 10 years experience, specializing in Plastic Injection Mould with Cold&Hot Runner/Gas Assistant Mould/High Glossy Mould/2K Injection Mould/IML/Stack Mould.

Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton

High Glossy Chrome Plating Mould for Plastic Parts
High Glossy Chrome Plating Mould for Plastic Parts
Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 30-45 days
Specification
Design Software: UG/CAD
Analysis Software: Moldflow
Preferred Formats: STP/IGES/UG
Design Time: 7-15 days
Manufacture Time: 20-30 days
Delivery Time: 30-45 days

Contact us if you need more details on Plastic Products. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Plastic Injection Molding、Plastic Part. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Coating Service